[Task]: Buildout To-do list #7

Open
opened 2024-02-14 01:09:01 +00:00 by adeck · 0 comments
Owner

Task description

  • Prepare alu for cuts
  • wheels
  • CNC wood panel test
  • order MDF panels
  • order formica laminate
  • plan hinges for back door
  • plan & order latches
  • order filament
  • order spray paint
  • plan DIN rail space
  • build frame
  • make changes to parts for function
    • top panel cable rotation
    • roof camera mount
    • roof LED mount
    • roof wiring
    • tray system
    • screen mount
  • cnc panels
  • cut formica laminate
  • populate build with electronics
    • attach LED rings
    • put LED strips into silicone holders
    • DIN rails assembly
    • power wiring & systems

Assign to Project

  • I have assigned to the project
### Task description - [x] Prepare alu for cuts - [ ] wheels - [ ] CNC wood panel test - [ ] order MDF panels - [ ] order formica laminate - [ ] plan hinges for back door - [ ] plan & order latches - [ ] order filament - [ ] order spray paint - [ ] plan DIN rail space - [ ] build frame - [ ] make changes to parts for function - [ ] top panel cable rotation - [ ] roof camera mount - [ ] roof LED mount - [ ] roof wiring - [ ] tray system - [ ] screen mount - [ ] cnc panels - [ ] cut formica laminate - [ ] populate build with electronics - [ ] attach LED rings - [ ] put LED strips into silicone holders - [ ] DIN rails assembly - [ ] power wiring & systems ### Assign to Project - [x] I have assigned to the project